This building consisted of primarily open to structure construction. With this extensive care to detail was required to ensure upright sprinkler protection was adequate to avoid obstructions such as large, exposed HVAC ducts, deep beams, and other architectural features. The building also featured 2 class 1 manual standpipes that provide 2-1/2″ hose connections for fire dept use on intermediate landings.
Description
This building consisted of primarily open to structure construction. With this extensive care to detail was required to ensure upright sprinkler protection was adequate to avoid obstructions such as large, exposed HVAC ducts, deep beams, and other architectural features. The building also featured 2 class 1 manual standpipes that provide 2-1/2″ hose connections for fire dept use on intermediate landings.
New Construction
75,000 to 100,000
5
500 to 750
5
NFPA 13, NFPA 14
Stand Pipe, Wet
Light, Ordinary
Municipal Supply