This project consisted of 2 multi use buildings, both with fire pumps and manual wet standpipe systems. This was also a modular project, so it required routing all the branchlines a different way than usual on the residential floors. A key map was also required on this project
Description
This project consisted of 2 multi use buildings, both with fire pumps and manual wet standpipe systems. This was also a modular project, so it required routing all the branchlines a different way than usual on the residential floors. A key map was also required on this project
New Construction
150,000 to 175,000
5
2,250 to 2,500
10
NFPA 13
Wet
Extra Hazard Group 1, Residential, Ordinary
Municipal +Fire Pump