The sprinkler design was carefully BIM-coordinated to avoid conflicts with cranes, ensuring seamless integration within the facility’s overhead layout. To protect the IT room, a pre-action cabinet system was installed using galvanized piping, and standard spray pendent sprinklers.
Description
The sprinkler design was carefully BIM-coordinated to avoid conflicts with cranes, ensuring seamless integration within the facility’s overhead layout. To protect the IT room, a pre-action cabinet system was installed using galvanized piping, and standard spray pendent sprinklers.
New Construction
75,000 to 100,000
2
750 to 1,000
4
NFPA 13
Preaction, Wet
Light, Ordinary
Municipal Supply