Skip to content

Campus Cares Supportive Housing

Description

Reno, NV

One unique thing about this project was the pipe routing. The system main was ran on the 2nd floor and all units on 1st floor were fed from a branch line that ran down through a chase in every unit.

Project Plans

Project Specs

Project Type
New Construction
Area of Application
0 - 25,000 sq. ft.
Number of Stories
2
Number of Sprinklers
0 - 250
Number of Zones
1
Design Standards
NFPA 13
System Type(s)
Wet
Occupancy Classifications
Light, Ordinary
Water Sources
Municipal Supply
/Driven
Contact

No More Design
Fire Drills

Schedule a consultation with Driven to talk through your project needs, timeline, and the design support it will take to keep things moving.

Request a Consultation