Skip to content

Alvarado Creek

Description

San Diego, CA

This podium-style modular project presented unique design and engineering challenges. The majority of the building was constructed in a manufacturing facility, transported to the job site, and assembled on-site, requiring extensive coordination between structural and fire protection systems. A key aspect of the project involved detailed seismic analysis, including the use of stamped structural calculations to fully utilize the maximum allowable loads of Hilti Kwik Bolt TZ2 and Hilti KCM-WF anchors. This approach ensured a code-compliant and efficient seismic bracing design while accommodating the complexities of modular construction.

Project Specs

Project Type
New Construction
Area of Application
275,000 - 300,000 sq. ft.
Number of Stories
6
Number of Sprinklers
3,250 - 3,500
Number of Zones
7
Design Standards
NFPA 13, NFPA 14, NFPA 20
System Type(s)
Wet, Stand Pipe, Fire Pump
Occupancy Classifications
Light, Ordinary, Residential, Car Stacker
Water Sources
Municipal + Fire Pump
/Driven
Contact Information

No More Design
Fire Drills

Schedule a consultation with Driven to talk through your project needs, timeline, and the design support it will take to keep things moving.

Request a Consultation