Skip to content

Palomar MOB 3

Description

Escondido, CA

Palomar MOB 3 is a three story office “shell” building. The automatic fire sprinkler system was designed with a fire pump, three zones with zone controls at each level in the stairway, and seismic bracing. This building was provided with “shell” coverage for future medical office space. This building was similar to another building that was designed and approved in the area by a different designer. The design file from the previous building was used in order to insure all the requirements and contractor preferences were met for a speedy approval.

Project Plans

Project Specs

Project Type
New Construction
Area of Application
50,000 - 75,000 sq. ft.
Number of Stories
3
Number of Sprinklers
500 - 750
Number of Zones
3
Design Standards
NFPA 13
System Type(s)
Fire Pump, Wet
Occupancy Classifications
Light, Ordinary
Water Sources
Municipal + Fire Pump
/Driven
Contact

No More Design
Fire Drills

Schedule a consultation with Driven to talk through your project needs, timeline, and the design support it will take to keep things moving.

Request a Consultation