Skip to content

LCB West Security Entrance

Description

Carson City, NV

The design of the system for the security entrance expansion involved the design of a system to protect three floors. A remote fire riser for each floor of the expansion was supplied off of the existing standpipe. The project was BIM coordinated with electrical, mechanical, and plumbing trades present. Additional coordination was required to accommodate a blast plate at the first floor security entrance. The blast plate limited or prevented access to structural steel members which limited the use of top beam clamps for hanging the first floor system. Sammy screw fasteners were opted for in this instance as the blast plate was designed to support mechanical equipment. Protection for the dome was omitted per NFPA 13 since it was a non-combustible area with limited access and no storage allowed.

Project Plans

Project Specs

Project Type
Addition to an Existing Building
Area of Application
0 - 25,000 sq. ft.
Number of Stories
3
Number of Sprinklers
0 - 250
Number of Zones
3
Design Standards
NFPA 13
System Type(s)
Wet
Occupancy Classifications
Light, Ordinary
Water Sources
Municipal Supply
/Driven
Contact

No More Design
Fire Drills

Schedule a consultation with Driven to talk through your project needs, timeline, and the design support it will take to keep things moving.

Request a Consultation