Skip to content

Oxford High School CTE Building

Description

Oxford, MS

The design of the Oxford Hich School CTE Building necessitated the use of BIM coordination and specialized seismic bracing methods to effectively protect the building in the event of a fire. Viking Microfast sprinklers were used throughout new construction and renovated areas along with extended coverage and standard spray concealed pendent sprinklers. Complex mechanical rooms required the use of BIM coordination to effectively route pipe and provide adequate protection above and below ductwork that would normally serve as an obstruction to the sprinkler discharge pattern. Additionally, lateral sway bracing was omitted from the second floor of the building as the majority of the hangers supporting cross mains were less than 6″ in length, an exception granted by NFPA 13. Longitudinal bracing and branch line restraints were still provided on this floor per NFPA 13 (2019).

Project Plans

Project Specs

Project Type
New Construction, Remodeled Facility
Area of Application
25,000 - 50,000 sq. ft.
Number of Stories
2
Number of Sprinklers
0 - 250
Number of Zones
2
Design Standards
NFPA 13
System Type(s)
Wet
Occupancy Classifications
Light, Ordinary
Water Sources
Municipal Supply
/Driven
Contact

No More Design
Fire Drills

Schedule a consultation with Driven to talk through your project needs, timeline, and the design support it will take to keep things moving.

Request a Consultation