Craighead County Courthouse

Description

Jonesboro, AR

This project is unique in that it has 2 manual wet standpipes and 1 combination standpipe. The third floor, though construction is incomplete, will mirror the layout of the second floor. The sprinkler piping system on the third floor is designed to replicate that of the second floor, ensuring both construction readiness and adequate protection for the existing shell space.

Project Plans

Project Specs

Project Type
Remodeled Facility
Area of Application
75,000 - 100,000 sq. ft.
Number of Stories
3
Number of Sprinklers
250 - 500
Number of Zones
1
Design Standards
NFPA 13
System Type(s)
Stand Pipe, Wet
Occupancy Classifications
Light, Ordinary
Water Sources
Municipal Supply