Description
Zumbrota, MN
This project featured: BIM Coordinated, Exterior Dry Standpipe with Nitrogen Generator, Coordination for piping passing through precast panels, Multiple Construction Types including: steel beam, steel joists, concrete double tee, and concrete slab, Multi-level platforms with sprinkler coverage beneath, Specify pipe types in process and non-process areas.
Project Specs
Project Type
New Construction, Remodeled Facility
Area of Application
50,000 - 75,000 sq. ft.
Number of Stories
6
Number of Sprinklers
500 - 750
Number of Zones
4
Design Standards
NFPA 13
System Type(s)
Dry, Fire Pump, Stand Pipe, Wet
Occupancy Classifications
Light, Ordinary, Storage
Water Sources
Municipal + Fire Pump