Description
Biloxi, MS
This project was unique due to the requirement for a reduced pressure backflow that was outside and above ground. This, along with the relatively poor water supply, required careful design to meet hydraulic requirements.
Project Specs
Project Type
New Construction
Area of Application
0 - 25,000 sq. ft.
Number of Stories
1
Number of Sprinklers
0 - 250
Number of Zones
1
Design Standards
NFPA 13
System Type(s)
Wet
Occupancy Classifications
Light, Ordinary
Water Sources
Municipal Supply